Bridge in a Weekend

Item Number: 17129
Time Left: CLOSED
Description
Massachusetts is one of the pioneering states for rapid bridge construction. Using this method, old bridges are demolished, new structures are rolled in, and the new bridge is open for traffic three days later. Join bridge engineer, Brian Brenner, as he describes his rapid bridge projects. Then join a tour of his latest, replacement of the Massachusetts Avenue Bridge Over Commonwealth Avenue in Back Bay this summer.
Special Instructions
Tour is scheduled for a Sunday in May/June/ early July 2017. There is some walking involved as we tour the site.
Donated by
Brian Brenner